Epoch Environmental Consulting

Asbestos Testing Fraser Valley

Technician performing dispersed oil particulate (DOP) testing on negative-air system

Asbestos Testing in Fraser Valley

If you’re planning renovations or demolition in Fraser Valley, asbestos testing is often required before disturbing materials in buildings constructed before 1990.

We provide:
• Bulk material sampling
• Asbestos laboratory analysis
• WorkSafeBC-compliant reporting
• Support for demolition and renovation permits

Our qualified inspectors work with homeowners, contractors, property managers and developers throughout Abbotsford, Chilliwack, Mission and Langley.

Why Asbestos Testing Is Required in Fraser Valley

Asbestos testing is required under WorkSafeBC regulations before renovation or demolition of older buildings. Most Fraser Valley municipalities require hazardous materials documentation before issuing demolition permits.

Failure to test can result in project delays, fines and stop-work orders. Proper inspection ensures compliance, worker safety and environmental responsibility.

Asbestos Testing vancouver

Common Asbestos Materials Found in Fraser Valley Homes

Many homes and commercial buildings in Fraser Valley built before the 1990s may contain asbestos in:

• Drywall joint compound
• Vinyl floor tiles and adhesives
• Ceiling textures
• Pipe insulation
• Exterior siding and roofing materials

Asbestos is not always visible. Laboratory testing is required to confirm presence before renovation.

Our Asbestos Testing Process

  1. On-site inspection and material assessment

  2. Safe sample collection

  3. Accredited laboratory analysis

  4. Detailed compliance report

Most Fraser Valley residential inspections are completed within 1–2 hours. Lab results are typically available within 24–48 hours.

Asbestos Testing Process Vancouver
Asbestos Testing

Areas We Serve in Fraser Valley

We provide asbestos testing throughout:

• Abbotsford
• Chilliwack
• Mission
• Langley
• Aldergrove
• Agassiz
• Hope

If your project is located anywhere in the Fraser Valley Regional District, our team can assist.

Asbestos Testing FAQs

Is asbestos testing required before renovation in Fraser Valley?

Yes. WorkSafeBC regulations require testing before disturbing suspect materials in older buildings.

How long does asbestos testing take?

Most residential inspections take 1–2 hours. Lab results are typically available within 24–48 hours.

Is asbestos testing required for demolition permits in Abbotsford or Chilliwack?

Yes. Municipalities typically require hazardous materials documentation prior to issuing permits.

What happens if asbestos is found?

If confirmed, we provide guidance on next steps, including removal or management in compliance with WorkSafeBC regulations.

Do you test commercial properties?

Yes. We work with contractors, developers and property managers across Fraser Valley.